Sunday, November 22, 2015

Work Continues

The work continues on the front walk.  We were unable to do anything Saturday because of the wind and cold.  Winds of 25-35 mph brought in a front.  It was very unpleasant.  Today it was cold but there was little wind so we worked 2-3 hours digging out some more of the walkway.



We are two-thirds finished at this point.

The crushed granite and flagstone were delivered.  Seems like a lot of both!

We have been putting the soil we've removed in low spots along the drive.  Not sure how successful it will be redirecting rain water to other areas.  If we are able to eliminate some standing water after a hard rain, we've done okay.